2025 Campus Improvement Projects

Photo of Old Main Drive

Centralized Bus Hub

All on- and off-campus AggieSpirit bus routes now originate from one centralized bus location along Old Main Drive, Central Houston Street, and West Lamar Street. This project includes bus shelters, widened sidewalks, and a wheeled device path connecting Academic Plaza to west campus.

Stallings Blvd. Garage

Stallings Boulevard

Pedestrian and wheeled device user paths have been separated from vehicular traffic to allow both modes to travel without conflict. The reconfigured travel lanes create additional capacity and unimpeded flow into Stallings Boulevard Garage with an added third entry lane.

Photo of Penberthy Boulevard

Penberthy Boulevard

Penberthy Boulevard has been expanded to four lanes of vehicular travel with the addition of multiuse paths for wheeled devices and pedestrians.

Photo of North Houston Street looking towards Northgate

North Houston Street

North Houston has been reconfigured to provide campus connectivity for pedestrians and wheeled devices to Northgate and the Post Office to include lighting.

Photo of Ross Street

Ross Street

Ross Street access is now limited to authorized vehicles to reduce conflicts in this area for future development of a pedestrian friendly and multimodal environment.

Aerial of Albritton Bell Tower

Passenger Drop-Off Zones

Some campus roads near Stallings Boulevard and the Centralized Bus Hub have been reconfigured and are no longer suitable for passenger drop-off or pickup. Temporary passenger drop-off zones have been created nearby to maintain convenient access.