2011 Campus Projects

Dates: June 2011 – August 2011

Cost: $165,000

Summary: Lot 76 is scheduled for renovation beginning Monday, June 6 and will continue through August 17. This renovation includes a new concrete lot, upgraded lighting, french drain around the building and the addition of bicycle parking. The work will be completed in two phases. Phase 1 will include the south half and Phase 2 will immediately follow on the north half.

lot 76 renovation

Dates: June 27 – August 19, 2011

Cost: $302,000

Summary: Lot 38 is scheduled for renovation to begin on Monday, June 27th till Friday, August 19, 2011. This project includes a new concrete surface, sidewalk work and upgraded lighting. This renovation will also include a drive lane that will connect Lot 38 to Lot 12 for use during special events. The work will be completed in two phases. Phase 1 will include the east half of the lot and Phase 2 will immediately follow to complete the west half.

lot 38 renovation

lot 38 near Vet Med

  • Lot 6 – Seal and repair joints in surface of parking lot
  • Lot 1 – Add a French drain to minimize water flow damage to parking lot
  • Lot 72b – Seal surface cracks in pavement to prolong life of the lot
  • Lot 26 – 34   Remove and replace surface of parking lot
  • Lot 40b – Repair and resurface sunken pavement over 30” wide utility trench
  • Lot 72 – Repair drainage inlet and overlay surface of lot with sealant
  • Lot 88 – repair crushed concrete top of drainage inlet
  • Lot 51 – Seal and patch surface
  • Lot 100 – remove and pour dumpster pad; seal surface cracks and patch
  • Lot 17 – Repair and replace surface of parking lot