Summary: Road repairs from Joe Routt to Coke dogleg leading to Trigon loop

Cost: $76,7152.57

Reconstruction of lots 30c and 32 near the Northside residence halls.

Lot 32 under construction

Lot 30c under construction

Preventive maintenance was performed on lot 100e near Reed Arena. The lot 100e repairs consisted of crack sealing, seal coating and striping the lot.

Lots 79 & 80 on Agronomy road were resurfaced.

Expansion joints were replaced.

Expansion joint near turn lane

Expansion joint near door

New lot constructed at Pearce Pavilion

Lot 63 sign

Lot 63 entrance

New lot constructed at PEAP Building

Lot 95 sign

Lot 95 entrance

Expansion joints were replaced; Repainted and repaired spalling

Northside Garage expansion joint